This was a newly constructed facility to house the water distribution system; replacing the existing pumping station at Fort Leonard Wood Military Base. The High Service Pump Station distributes water to every water tower; essentially providing water to all personnel on the base. This job also involved integration from separate onsite systems, providing comprehensive control for all treatment facility staff. The system installed will provide seamless operation, greater accessibility, and fully automated operation to all onsite operations staff.

Equipment Controlled In Building
3 - 200HP High Service Pumps, 2 - 125HP Backwash Pumps, and utility monitoring