This was a new construction project. The addition on the existing Tech Escort building included classrooms, administrative area, briefing area, and an After Action Review Room.

Equipment Controlled in Building

2 Air Handling Units, 14 Dual Duct VAVs, 1 Blower Coil Air Handler, Chilled Water System, Hot Water System, along with controls over numerous other small pieces of equipment and utility monitoring