This was a complete renovation project, consisting of three (3) barracks (totaling approximately 40,000 SF). Upon completion TBUPS 12 provide a completely up to date LEED Silver efficient facility for its occupants.

Equipment Controlled in Building 737 and 738

2 Air Handling Units, 2 Energy Recovery Units, 11 VAVs, 19 FTUs, Chilled Water System, Hot Water System; along with controls over numerous other small pieces of equipment and utility monitoring

Equipment Controlled in Building 1016

9 Air Handling Units, 3 Energy Recovery Units, 106 VAVs, Chilled Water System, Hot Water System, Domestic Hot Water System, Solar Hot Water Collection System, along with controls over numerous other small pieces of equipment and utility monitoring.