November 20, 2020
The Advanced Individual Training (AIT) Barracks (Phase 2) project consisted of 4 new 3-story barracks buildings capable of housing well over 1200 soldiers. The first phase consisted of 3 of the 4 barracks and a dining facility. The second phase consisted of the 4th and final barracks. Controlco was involved on both AIT Phase 1 & 2.
Equipment Controlled in Barrack
1 Air Handling Unit, 3 Dedicated Outdoor Air Units, 10 VAVs, 156 Fan Coil Units, 4 Rooftop Units, Chilled Water System, and a Hot Water System; along with controls over numerous other small pieces of equipment and utility monitoring