This was a new construction project. Project consisting of renovation of a dining hall (approximately 13,280 SF), two (2) Company Operations Facilities (approximately 12,155 SF each) and two (2) Battalion HQ’s (approximately 6,136 SF each). TBUPS 11 is a LEED Silver Project.
Equipment Controlled in Each COF
5 Air Handling Units, 1 Dedicated Outdoor Air Unit, 10 VAVs, Chilled Water System, Hot Water System; along with controls over numerous other small pieces of equipment and utility monitoring
Equipment Controlled in Each Battalion HQ
2 Air Handling Units, 5 VAVs, Chilled Water System, Hot Water System, along with controls over numerous other small pieces of equipment and utility monitoring
Equipment Controlled in Dining Hall
2 Air Handling Units, 2 Make Up Air Units, Chilled Water System, Hot Water System, along with controls over numerous other small pieces of equipment and utility monitoring