The overall project consists of (4) separate projects. The first project consists of renovating several floors of the existing Hospital along with site reconstruction at the emergency room entrance and parking lots. The second project consists of replacing the existing Hospital generators with new fuel powered generators and various architectural renovations to the area surrounding the new generators. The third project consists of removing and replacing steam tunnel lids and steam piping along with structural repairs to the existing steam tunnel walls. The fourth project consists of structural repairs and vent pipe replacement of an existing steam tunnel manhole at the emergency ambulance drive.
The BAS was an extension of the Johnson Controls BAS for all HVAC and also incorporated systems monitoring of the new emergency power systems.
Estimated completion – 2019