March 10, 2017
Mizzou’s new $16 million, 1,700-seat softball stadium has a full-view concourse and outfield plaza, an outfield lawn area for additional spectators, elevated press box, heated dugouts, team lounge, theater and video room, rehab facility and coaches offices among other amenities.
Controlco installed the Direct Digital Control system which was an extension of the campus Johnson Control’s Metasys building automation system. Systems included Energy Recovery Air Handling Systems, variable air volume terminals, and fan coil units. Both steam and chilled water usage are metered utilizing ABB steam swirl flow meters and Siemens Mag-Flo meters.